All projects

Laboratory

Gas Laboratory

CSIRO Pullenvale

Project overview

Built with precision and care.

Venn Constructions were the successful tenderer to construct the new gas testing laboratory at the CSIRO Pullenvale site. The new structure was built within a large existing shed. Although the facility has a relatively small footprint, it was a considerably involved construction incorporating heavy structural steel works with a mezzanine floor above.

An intricate gas supply panel and extraction system was installed together with all necessary safety equipment. All joinery and cabinetry for the project was constructed in our fully equipped Capalaba workshop.

Gas Laboratory

Planning a project?

Talk to Venn Constructions about your construction or refurbishment requirements.

Start a conversation