Gas Laboratory
- New Residential Cleveland
- Gas Laboratory
- Genomics Laboratory
- Mayne Medical School
- Steele Building
- Michie Writing Studio
- AEB Office Extension
- Residential Renovation
- Energy Test Lab
- Free Range Kids Kitchen
- Fryer Library
- Train Carriage Yumantra Fitout
- CSIRO Changeroom Refurbishment
- HDR Computer Lab
- CSIRO Moon Base
Gas Laboratory
CSIRO Pullenvale
Venn Constructions were the successful tenderer to construct the new gas testing laboratory at the CSIRO Pullenvale site.
The new structure was constructed within a large existing shed which was located on the site.
Although the overall area of the structure has a relatively small footprint it was a considerably involved construction, incorporating heavy structural steel works with mezzanine floor over.
An intricate gas supply panel and extraction system was installed along with all the necessary safety equipment associated with this style of testing facility. All joinery & cabinetry for the project was constructed in our fully equipped workshop at Capalaba.